Texas large-load (data center) demand

Updated Oct 9, 2026
ERCOT documents read Oct 9, 2026 · checked daily · our stored snapshots start Oct 9, 2026
ERCOT’s August 2026 Monthly Operational Overview says 9,456 MW of large loads (75 MW or more) have received Approval to Energize. ERCOT observed a non-simultaneous peak consumption of 4,316 MW from them that month (45.6% of the approved MW, our calculation). ERCOT told the Texas Senate it is tracking about 474 GW of large-load interconnection requests (as of June 2026); about 90% data centers. Requests are not approvals and not load that exists. ERCOT’s peak demand record is 91,134 MW (Jul 22, 2026, preliminary); the previous record was 85,508 MW (August 2023). Numbers are read from ERCOT’s published documents and shown as ERCOT states them; nothing is estimated. Where we calculate a share, it says so. ERCOT’s records are unofficial until final settlement. Source: TexasHomeBills™ — https://texashomebills.com/data/large-load-demand
Approved to energize
9,456 MW
large loads, ERCOT report for August 2026
Observed peak of those
4,316 MW
45.6% of approved MW; sum of each load’s own monthly maximum
Requests ERCOT is tracking
474 GW
as of June 2026 · about 90% data centers
Peak demand record
91,134 MW
Jul 22, 2026 · preliminary

Large loads approved to energize, by month

02,5535,1067,65910,21205/2508/2511/2502/2605/2608/26
Approved to energize (MW)Observed peak (MW)

By report month, MM/YY. Observed peak is the sum of each load’s own highest value, not a simultaneous peak.

Report monthApproved MWObserved peak MW Observed ÷ approvedSource
August 20269,456 4,316 45.6% ERCOT PDF
July 20269,456 4,370 46.2% ERCOT PDF
June 20268,926 3,966 44.4% ERCOT PDF
May 20269,062 4,145 45.7% ERCOT PDF
April 20269,012 4,006 44.5% ERCOT PDF
March 20269,042 4,008 44.3% ERCOT PDF
February 20269,043 4,037 44.6% ERCOT PDF
January 20268,787 4,049 46.1% ERCOT PDF
December 2025 *8,787 3,349 38.1% ERCOT PDF
November 2025 *7,502 3,827 51.0% ERCOT PDF
October 2025 *7,502 3,960 52.8% ERCOT PDF
September 2025 *7,502 4,126 55.0% ERCOT PDF
August 20257,502 3,694 49.2% ERCOT PDF
July 20257,150 3,820 53.4% ERCOT PDF
June 20256,874 3,605 52.4% ERCOT PDF
May 20256,874 3,489 50.8% ERCOT PDF
April 20256,779 3,691 54.4% ERCOT PDF

From ERCOT’s Monthly Operational Overview, slide “Loads Approved to Energize – Observations”. Approved MW: large loads (75 MW or more) with Approval to Energize from ERCOT Operations. Observed peak: ERCOT’s non-simultaneous monthly peak consumption of those loads, the sum of each load’s own maximum in the month; it is not the grid’s simultaneous peak. The last column is our division, rounded to 0.1. ERCOT published this slide from April 2025; earlier months are not available and are not estimated.
* ERCOT’s own sentence names the following month for this report (for example the September 2025 report says “October 2025”); we list it under the month of the report.

Download every row: CSV · JSON · API · MCP

Large-load requests ERCOT is tracking

ERCOT documentGWData centersAs of
Jul 29, 2026474 ~90%as of June 2026
May 24, 2026438 —deck date
Apr 1, 2026410 ~87%as of March 26, 2026

GW of large-load interconnection requests ERCOT says it is tracking, from its presentations to the Texas Senate (Apr 1 and Jul 29, 2026) and Board (item 8, posted May 24, 2026). A request is not an approval and not load that exists. “—” means the document does not give the data-center share in text. ERCOT’s breakdown of requests by study stage is a chart picture in its reports; we do not read pictures, so no stage breakdown is shown. ERCOT’s documents we read give no other split by load type.

Batch Zero classification (ERCOT Board, Sep 11, 2026)

ClassProjectsGW
Base load (conditional)20466.4
Studied load (conditional)158127.9
Excluded from Batch Zero373302.2
Total (our sum)735496.5

ERCOT: Batch Zero is ERCOT’s one-time transitional study of large loads that want to interconnect. The classification is conditional: ERCOT is verifying eligibility and auditing data centers and crypto-mining loads, with its report due to the PUCT by Dec 10, 2026. The same deck’s chart labels studied load 125.4 GW while its text says 127.9 GW; we show the text figure.

Peak demand: record and forecast

ERCOT’s highest demand each year

0 GW25 GW50 GW75 GW100 GW74,820201974,376202073,687202180,148202285,508202385,425202480,560202591,0892026*

Highest hourly demand of the year, MW. * = preliminary (lighter bar).

YearMWWhen
202691,089July 22; preliminary
202580,560February
202485,425August
202385,508August
202280,148July
202173,687August
202074,376August
201974,820August

From ERCOT’s yearly peak demand archive (back to 2000 in the CSV and JSON). ERCOT uses the integrated hourly system load; records are unofficial until final settlement and can change slightly. For July 22, 2026, ERCOT’s archive page lists 91,089 MW, while its 2026 records page and July Operational Overview list 91,134 MW; both are published by ERCOT, and the card above uses 91,134 MW. ERCOT →

ERCOT’s summer peak forecast (2025 Long-Term Load Forecast, posted April 2025) and what happened

SummerERCOT adjusted MWTSP provided MW Highest actual so far MWActual vs adjusted
202585,75993,655 83,679
Aug 18, 2025 · 4 of 4 months
-2.4%
202694,650109,031 91,134
Jul 22, 2026 · 3 of 4 months
-3.7%
2027104,295138,193 — —
2028121,543173,231 — —
2029128,851196,678 — —
2030138,944208,014 — —
2031144,522218,420 — —

Net coincident summer peak forecast, MW, from ERCOT’s “Summer and Winter Peaks” file: “TSP provided” is what transmission service providers submitted, “ERCOT adjusted” is ERCOT’s own adjustment. “Highest actual so far” is the largest of the June–September monthly peaks we have from ERCOT’s Monthly Operational Overviews (preliminary values; the number of months reported is shown), so a year with fewer than 4 months is incomplete. The comparison is a division, rounded to 0.1, and says nothing about why the forecast and the actual differ. A newer forecast, when ERCOT posts one, will be added next to this one. ERCOT XLSX →

Winter peak forecast
WinterERCOT adjusted MWTSP provided MW
2025-202678,55786,060
2026-202790,192106,956
2027-2028111,711143,879
2028-2029134,192162,552
2029-2030152,109187,795
2030-2031161,916201,054
2031-2032169,087212,268

Our stored history

TexasHomeBills started saving these numbers on Oct 9, 2026. Each time ERCOT publishes a new report or presentation we store its numbers with the document’s date and URL and never overwrite an earlier report; if ERCOT revises a number, we keep the previous one. Today we hold 155 values from 38 ERCOT documents. Months before our start are read back from ERCOT’s own earlier reports, as far back as ERCOT states them in text (April 2025 for large loads); we do not estimate months ERCOT did not report.

PUCT items about large loads

Items on the Public Utility Commission of Texas’s news-release and recent-rule-changes pages whose project number is 58479, 58480 or 58481 or whose title mentions large loads or data centers (we tag them from the title). The date is the date the PUCT lists. Rule titles are the PUCT’s; read the PUCT page for status and text. PUCT → · Texas Senate Bill 6 (2025) →

Why this matters for your bill

Your Texas electricity bill has an energy charge set by your retail plan and delivery charges set by your utility under rates the PUCT regulates. We have no source that measures how data-center or other large-load demand has changed either charge, so we make no claim that it has or will. What the sources show side by side:

Method

ERCOT does not publish a recurring data file of large loads, so we read the numbers ERCOT states in the text of its documents: the Monthly Operational Overview PDFs (linked from ERCOT’s Board page), the peak demand records pages, the Long-Term Load Forecast “Summer and Winter Peaks” file, and a fixed list of Board and Senate presentations. We store each number with its document URL and never fill a gap. Figures that ERCOT only shows in charts are not read. Large load means 75 MW or more in ERCOT’s Batch Zero documents.

Frequently asked questions

How much electricity do data centers use in Texas?

ERCOT does not publish data-center consumption on its own. It reports large loads (75 MW or more) of all kinds: 9,456 MW had Approval to Energize in its August 2026 report, and the observed non-simultaneous peak consumption of those loads that month was 4,316 MW. ERCOT says about 90% of the large-load requests it is tracking are data centers (a statement about requests, not about load that exists).

What is a large load?

In ERCOT’s Batch Zero documents, a Large Load is a load of 75 MW or greater seeking to connect to the ERCOT system, for example a data center or a cryptocurrency-mining facility.

Are data centers raising my electricity bill?

We do not have a source that measures that, so we do not say so. This page lists what ERCOT, the EIA and the PUCT publish. Your bill depends on your plan’s energy price, your utility’s delivery charges and your usage.

What is ERCOT’s peak demand record?

91,134 MW on Jul 22, 2026, reported as preliminary by ERCOT; the previous record was 85,508 MW (August 2023). ERCOT’s records are unofficial until final settlement.

Can I use this data?

Yes, free, with attribution: name TexasHomeBills™ and link to this page. The numbers come from ERCOT and the PUCT documents linked in each row; please credit them too. Download every row as CSV or JSON, or use the API.

TexasHomeBills is independent. Not affiliated with or endorsed by ERCOT or the PUCT. All data →

How to cite

TexasHomeBills™, “Texas large-load (data center) demand” (data as of Oct 9, 2026), https://texashomebills.com/data/large-load-demand

Free to reuse, quote and republish with attribution: name TexasHomeBills™ and link to this page. Terms of Service →

TexasHomeBills™ — Texas electricity plans ranked by what they really cost you.
Reading time:
Views: 2
Claude: 1 Others: 6
Read by AI & crawlers
Claude1
Others6

Named by what the crawler says it is; look-alikes we detect are counted under Others. Google · Gemini includes Googlebot, Google’s search crawler, whose index Google also uses for its AI features; other search engines and bots are in Others.